| Photo | Mfr. Part # | Availability | Price | Quantity | Datasheet | Series | Packaging | Product Status | Type | Function | Embedded | Utilized IC / Part | Primary Attributes | Secondary Attributes | Contents |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
DRV8802EVMEVAL BOARD FOR DRV8802 Texas Instruments |
3,658 | 178.80 |
|
Datasheet |
- | Box | Active | Power Management | Motor Controller/Driver | Yes, MCU, 16-Bit | DRV8802 | Dual Full-Bridge (H-Bridge), 1.1A (1.6A Peak), 8.2V ~ 45V | - | Board(s) |
|
UCC28063EVM-723EVAL BOARD FOR UCC28063 Texas Instruments |
3,009 | 178.80 |
|
Datasheet |
Natural Interleaving™ | Bulk | Active | Power Management | Power Factor Correction | No | UCC28063 | 85 ~ 265V Input, 390V 300W Output | - | Board(s) |
|
PCM2707EVM-UEVAL BOARD FOR PCM2707 Texas Instruments |
3,070 | 178.80 |
|
Datasheet |
- | Box | Active | Audio | Audio/Stereo DAC | No | PCM2707 | - | - | Board(s) |
|
TS3USBCA410EVMEVAL BOARD FOR TS3USBCA4 Texas Instruments |
2,646 | 210.00 |
|
Datasheet |
- | Bulk | Active | Interface | USB Type-C® | - | TS3USBCA4 | - | - | Board(s) |
|
TUSB3210KBDPDKEVAL BOARD FOR TUSB3210 Texas Instruments |
4,141 | 210.14 |
|
Datasheet |
- | Box | Active | Interface | USB | Yes, MCU, 8-Bit | TUSB3210 | USB Keyboard | On-Board LEDs | Board(s) |
|
CDCE18005EVMEVAL BOARD FOR CDCE18005 Texas Instruments |
2,440 | 238.80 |
|
Datasheet |
- | Box | Active | Timing | Clock Buffer/Driver/Receiver/Translator | No | CDCE18005 | 3 Inputs, 10 Outputs | Graphical User Interface (GUI) | Board(s), Cable(s) |
|
TSC2013EVMEVAL BOARD FOR TSC2013-Q1 Texas Instruments |
4,129 | 238.80 |
|
Datasheet |
- | Box | Active | Interface | Touch Screen Controller | Yes, MCU, 16-Bit | TSC2013-Q1 | - | - | Board(s) |
|
PCM1860EVMEVAL BOARD FOR PCM1860 Texas Instruments |
4,324 | 238.80 |
|
Datasheet |
- | Bulk | Active | Audio | Audio Processing | No | PCM1860 | Audio Front End | On-Board LEDs | Board(s) |
|
PCM1862EVMEVAL BOARD FOR PCM1862 Texas Instruments |
4,234 | 238.80 |
|
Datasheet |
- | Bulk | Active | Audio | Audio Processing | No | PCM1862 | Audio Front End | On-Board LEDs | Board(s) |
|
LP8770Q1EVMEVAL BOARD FOR LP8770-Q1 Texas Instruments |
3,199 | 238.80 |
|
Datasheet |
- | Box | Active | Power Management | Special Purpose: Mobiles | - | LP8770-Q1 | - | - | Board(s), Cable(s) |