| Photo | Mfr. Part # | Availability | Price | Quantity | Datasheet | Series | Packaging | Product Status | Type | Function | Embedded | Utilized IC / Part | Primary Attributes | Secondary Attributes | Contents |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
BQ34210IQ1EVM-826EVAL BOARD FOR BQ34210-Q1 Texas Instruments |
4,426 | 118.80 |
|
Datasheet |
- | Bulk | Active | Power Management | Fuel Gauge | - | BQ34210-Q1 | - | - | Board(s) |
|
TPS27S100AEVMEVAL BOARD FOR TPS27S100A Texas Instruments |
2,155 | 118.80 |
|
Datasheet |
- | Bulk | Active | Power Management | Power Distribution Switch (Load Switch) | - | TPS27S100A | - | - | Board(s) |
|
TPS27S100BEVMEVAL BOARD FOR TPS27S100B Texas Instruments |
4,498 | 118.80 |
|
Datasheet |
- | Bulk | Active | Power Management | Power Distribution Switch (Load Switch) | - | TPS27S100B | - | - | Board(s) |
|
UCC27212EVM-328EVAL BOARD FOR UCC27212 Texas Instruments |
3,027 | 118.80 |
|
Datasheet |
- | Bulk | Active | Power Management | Half H-Bridge Driver (External FET) | - | UCC27212 | - | - | Board(s) |
|
TLV1805Q1EVMEVAL BOARD FOR TLV1805-Q1 Texas Instruments |
4,639 | 118.80 |
|
Datasheet |
- | Bulk | Active | Linear | Comparator, Single | - | TLV1805-Q1 | - | - | Board(s) |
|
BQ25601DEVM-877EVAL BOARD FOR BQ25601D Texas Instruments |
1,116 | 118.80 |
|
Datasheet |
- | Bulk | Active | Power Management | Battery Charger | - | BQ25601D | Li-Ion / Li-Pol (1 Cell) | I2C Interface(s), Graphical User Interface (GUI) | Board(s) |
|
DS90LV011-12AEVMEVAL BOARD DS90LV011A DS90LV012A Texas Instruments |
2,663 | 118.80 |
|
Datasheet |
- | Bulk | Active | Interface | LVDS | - | DS90LV011A, DS90LV012A | - | - | Board(s) |
|
UCC24624EVM-015EVAL BOARD FOR UCC24624 Texas Instruments |
4,966 | 118.80 |
|
Datasheet |
- | Box | Active | Power Management | Gate Driver | - | UCC24624 | - | On-Board Test Points | Board(s) |
|
TPS66020EVMEVAL BOARD FOR TPS66020 Texas Instruments |
3,842 | 118.80 |
|
Datasheet |
- | Box | Active | Power Management | Power Distribution Switch (Load Switch) | - | TPS66020 | - | On-Board LEDs, Test Points | Board(s) |
|
BQ25883EVMEVAL BOARD FOR BQ25883 Texas Instruments |
3,313 | 118.80 |
|
Datasheet |
- | Box | Active | Power Management | Battery Charger | - | BQ25883 | Li-Ion / Li-Pol (2 Cells) | On-Board LEDs, Test Points | Board(s) |